Construction of new Library and Civic Centre designed by RDH Architects and Jain and Associates Engineering. HVAC and plumbing were both performed.
Forest Trails Public School
Full mechanical in two storey addition to the school
Orchard Point Condominiums Phase 1
New 50 Unit Condominium in Orillia. KP&H were responsible for HVAC and plumbing.
Rockhaven Condominiums
60 Unit 3 Storey Residential Condominium with Commercial spaces on the ground level. KP&H performed all plumbing and HVAC related work on this project.
Stonechurch Residences
The Stonechurch Residence project was a 5-Storey retirement residence for CityHousing Hamilton. KP&H executed a full mechanical scope, including plumbing and HVAC. The system installed was that of a typical mid-rise condo with heat pumps in each suite, cooling tower and boilers in the mechanical room. KP&H maintained staffing through the duration of the project and were not responsible for any delays to the schedule. KP&H fully executed our contract as a stipulated lump sum contract, with few change orders that were not brought forward by changes in the architectural scope.
Two Sisters Winery
The Two Sisters Winery project was a new showpiece winery for the owner of Solmar Developments.
The project was initially over budget but with KP&H’s mechanical knowledge we helped get the mechanical number down to where they required (cutting off 200K in value), all while meeting the mechanical intent of Hallex Engineerings design. KP&H’s scope of work included: all underground plumbing, interior plumbing, HVAC system, chiller system for the wine manufacturing, and kitchen exhaust systems. Keith’s kept the pace of the project by meeting timelines given by the General Contractor. There were extensive changes to the contract and scope of work by the owner that KP&H priced quickly and completed to changes as soon as possible.
812 Burnhamthorpe Re-Pipe
This project was a repipe of an occupied 23-storey building. KP&H was responsible for all drywall, ceiling cutting and patching. We also had to ensure the water was turned back on for the tenants every evening by 5pm.
GHA Surgical Clinic
Mechanical fit up of a private surgical clinic. KP&H were also responsible for helping the owner obtain a Class 1 surgical room by installing a design build HVAC system to keep the room under positive pressure.
Viscount Montgomery Heating Re-Pipe
Demolition and installation of complete hyrdonic piping system in the crawl space under the school. 14,000 feet of pipe was torn out and reinstalled in two months during the summer break.
London Court House – Heat Exchanger Upgrades
Demolition and replacement of water to steam heat exchangers, as well as all new pumps. This project was completed after hours, during the summer, to ensure the court house maintained operation for the duration of the project.