Demolition and installation of new 350 Tonne Centrifugal Chiller. All associated piping, electrical, and control work was also performed. This project started in July and was complete by September when school started.
Jackson Street Boilers
This project was a complete replacement of the domestic heating and hot water heating boiler systems. The project was phased so the building was never out of hot water and the heating never had to be turned off.
Two Sisters Barn and Greenhouse
In addition to the Two Sisters Winery, KP&H built a wine storage facility and offsite greenhouse on an adjacent property. The Greenhouse was built as a design build by KP&H and the owners of the Winery.
Niagara Falls City Hall HVAC Retrofit
The Niagara Falls City Hall HVAC Retrofit project is our best example of being able to execute the full contract outlined in RFP 14-280. Keith’s Plumbing and Heating was responsible for: structural modifications, removal and replacement of ceiling grids in office spaces, electrical modifications, and a full HVAC replacement. The whole scope of work was done without interrupting working ability of Niagara Falls City Hall employees. The scope of work on the mechanical side included; the demolition and replacement of the hot water heating boilers, the demolition and installation of a new AHU in a doghouse on the roof, the demolition and replacement of two chillers and cooling towers, the installation of new VAVs and control valves for zoning, and the demolition and replacement of the full controls system.
Pilgrim Wood Public School – Oakville
Replaced boilers, pumps, cooling tower, and heat pumps and completed mechanical required for new kindergarten classrooms
West End Community Center
Replaced two AHU with remote condensers
First Place – AHU and HRU Installation
The First Place AHU Installation is one of KP&H shining projects completed in the past three years. The project was run by KP&H as a prime mechanical. KP&H was responsible for roofing, structural, interior remediations, electrical, controls, and the installation of a new 75,000CFM EngAir AHU and Remote HRU. The AHU came in 3 sections requiring the hoisting, placement, and connection of all 3 pieces. Demolition of the interior AHU and return fans were required. All ducting was completed on the roof with exterior aluminum cladding and placed on pre-engineered roof stands. New structural steel and roofing was required to place the new units on the roof.
Unified Courthouse Phase 1 and 2
Phase 1 was a retrofit to the existing court house boiler system. Removing 2 De Deitrich Boilers and replacing with 3 Lochinvar Boilers. Phase 2 was a complete overhaul of the controls and air distribution system, including all new VAV boxes and associated piping. All work was performed after hours or on weekends.
Procor Rail Car – Hamilton
Replaced two compressors and one dryer, repiped compressor room
Appleby Gardens
70 Unit Condo Building. The first of many upcoming projects with LJM Developments and KP&H.